Supply DC9V to the plunger, and turn the power ON and OFF. (→ Power +PL, -PL) (Cf. Fig. 5)
-
FWD PLAY: Supply the plunger power in a flash. (ON: approx. 5msec)
-
FWD FF: Supply the plunger power in a flash at PLAY mode. (ON: approx. 5msec)
-
STOP: Supply the plunger power in a flash at FWD FF mode. (ON: approx. 5msec)
-
REV PLAY: Supply the plunger power in a normal timing at STOP mode. (ON: approx. 200msec)
-
REV REW: Supply the plunger power in a flash at REV PLAY mode. (ON: approx. 50msec)
-
STOP: Supply the plunger power in a flash at FF mode. (ON: approx. 50msec)
Repeat the operation (→ FWD PLAY)
(Note) Other operation may start if a timing of supplying the plunger power is missed.